ASPICE Training ( aspicetrainingli | 7 hours )
Course Outline:
课程内容:
AM
09:00am~09:30am Module 1: Welcome and Introduction Process
- Course introduction
- Problems in projects and products, what is the process
- Process definition (elements contained in the process &related definitions and descriptions)
- Process Improvement
09:30am~10:30am Module 2: Automotive SPICE
- Process model
- Process and capability dimension
- ASPICE evolution and application
- OEM process requirements for suppliers
- Criteria for judging process capability
- Detailed explanation of process capability level 1-3
- Introduction to Intacs
10:30am~10:45am ² break
10:45am~12:00am Module 3: Managing Process (MAN.3)
- Elements of the project plan (e.g. scope, estimate and plan)
- Consistency relationship between project plan elements
- Project monitoring content
- Project problems and risk control
- Define project life cycle model
12:00am~13:00pm ² Lunch
PM
13:00pm~14:30pm Module 4: Understanding Requirements
- Identify and analyze requirements (SYS.1)
- Product system requirements (SYS.2)
- System design\System interface requirementsd
- software requirements(SWE.1)
14:30pm~15:00pm Module 5: Designing&Implementing Solution
- Content of software architecture design (SWE. 2)
- Contents of detailed software design (SWE. 3)
- Design granularity requirements and coding specifications
15:00pm~15:15pm ² break
15:15pm~15:45pm Module 6: Verifying implementation ²
- Software unit verification methods and requirements (SWE. 4)
- Test objectives and methods, test case, test coverage, regression test
- Traceability requirements and test
- System and software integration(SYS.4\SYS.5)
- System and software qualification test(SWE.5\SWE.6)
15:45pm~17:00pm Module 7: Supporting Processes ²
- Quality assurance: quality assurance methods, non conformance problems and reporting mechanism(SUP.1)
- Configuration management: Configuration Item, configuration library, baseline Configuration audit, branch and backup(SUP.8)
- Issue management: issue management scope, management workflow(SUP.9)
- Change management: change processing status, change processing workflow(SUP.10)
- Supplier monitoring: protocol process, development interface protocol, information exchange and joint review(ACQ.4)