ASPICE Training ( aspicetrainingli | 7 hours )

Course Outline:

課程內容:

AM

09:00am~09:30am Module 1: Welcome and Introduction Process

  • Course introduction
  • Problems in projects and products, what is the process
  • Process definition (elements contained in the process &related definitions and descriptions)
  • Process Improvement

09:30am~10:30am Module 2: Automotive SPICE

  • Process model
  • Process and capability dimension
  • ASPICE evolution and application  
  • OEM process requirements for suppliers
  • Criteria for judging process capability
  • Detailed explanation of process capability level 1-3
  • Introduction to Intacs

10:30am~10:45am ² break

10:45am~12:00am Module 3: Managing Process (MAN.3)

  • Elements of the project plan (e.g. scope, estimate and plan)
  • Consistency relationship between project plan elements
  • Project monitoring content
  • Project problems and risk control
  • Define project life cycle model

12:00am~13:00pm ² Lunch

PM

13:00pm~14:30pm  Module 4: Understanding Requirements

  • Identify and analyze requirements (SYS.1)
  • Product system requirements  (SYS.2)
  • System design\System interface requirementsd
  • software requirements(SWE.1)

14:30pm~15:00pm Module 5: Designing&Implementing Solution

  •  Content of software architecture design (SWE. 2)
  •  Contents of detailed software design (SWE. 3)
  •  Design granularity requirements and coding specifications

15:00pm~15:15pm ² break

15:15pm~15:45pm  Module 6: Verifying implementation ² 

  • Software unit verification methods and requirements (SWE. 4)
  • Test objectives and methods, test case, test coverage, regression test
  • Traceability requirements and test
  • System and software integration(SYS.4\SYS.5)
  • System and software qualification test(SWE.5\SWE.6)

15:45pm~17:00pm Module 7: Supporting Processes ²

  • Quality assurance: quality assurance methods, non conformance problems and reporting mechanism(SUP.1)
  • Configuration management: Configuration Item, configuration library, baseline Configuration audit, branch and backup(SUP.8)
  • Issue management: issue management scope, management workflow(SUP.9)
  • Change management: change processing status, change processing workflow(SUP.10)
  • Supplier monitoring: protocol process, development interface protocol, information exchange and joint review(ACQ.4)